Skip to content

Enabling Liquid Air Energy Storage with Siemens

Get a Quote

The Customer

June 2018 saw the official opening of the world’s first liquid air energy storage plant, designed and developed by Highview Power and housed at project partner Viridor’s, Pilsworth site in Bury.

The plant is enhanced with Siemens technology, to provide instant energy on demand. The combined system can store enough energy for around 5000 homes for several hours, with fast response

The Challenge

Given their durability and versatile interiors, Siemens recognised that there would be many benefits to housing their technology inside of a shipping container. As a result, Siemens reached out to S Jones directly to ensure their requirements for a containerised solution could be fully met.

The S Jones Solution

Utilising a wealth of experience, S Jones delivered a number of innovative and vital elements to this revolutionary project, including;

  • Agile Digital Visualisation:  S Jones created a detailed 3D CAD design model of the container which imported the relevant Siemens technology needed to power the plant. This visualisation was used in Siemens virtual reality simulator enabling S Jones to guide the customer around the art of the possible, enabling quicker decision making and stakeholder engagement for the customer
  • Risk Mitigation: S Jones installed sound attenuated linings and a fire alarm system to ensure health and safety combined with corporate mitigations are adhered to throughout the life of the container plant.
  • Expert Engineering Knowledge: One of the biggest challenges of the container was creating enough space to accommodate the sheer scale of the technology required to run the plant efficiently. S Jones provided complex structural modifications such as a galvanized steel roof platform and a sub floor stiffening structure to ensure the customer had peace of mind that the plant would run safely and effectively.
  • In-house Proofing and Fabrication: S Jones provide end to end customer journey, from initial concepts through to the final design sign off. S Jones completed the fabrication of the container in their workshop in the West Midlands, offering Siemens the opportunity to see their vision turned into a reality, every step of the way.
Emergency door open on green container

What Siemens Had To Say

Kevin Patterson, Project Manager, Siemens commented:

“S Jones provided a flexible approach to this prototype design allowing multiple design changes to be included throughout the build. This allowed our engineers to fully develop this world first concept. The results are a high quality solution, fully meeting our requirements”.

What Our Customers Say

Christine
1st Aug 2025

Shazia was helpful from my first enquiry to the delivery of my container. She sorted any query and enabled me to buy exactly what I was looking for. The driver who delivered container was also a credit to his company. Nothing was too much trouble and everything done with a smile .

Phil
20th Jun 2025

Got in touch with Shazia at the depot she organised everything delivery was a bit worrying as the area was tight but the delivery guy was amazing and got them exactly where we wanted them ,, all a very good service provided

Stephen
20th Jun 2025

Responsive, efficient and evenly priced. Highly recommended.

Mary
29th Apr 2025

Very helpful over the phone and the driver was very good would definitely use again

Steve
27th Feb 2025

Very good service

Get a Quote

Interested in our containers or modular buildings? Please fill out the form, and a member of our team will be in touch shortly.

Call free on
0800 1954 538