Modular solutions for leading infrastructure solutions supplier

Having worked with global solutions specialists Acciona for a year to supply various modular buildings at one of its larger sites, the leading sustainable infrastructure solutions provider recently tasked our team with supplying a series of new modular units.

Stacked three-story modular building units connected with an external metal staircase on a construction site

The challenge

Specialising in renewable energy, Acciona invests in, develops, and operates infrastructure assets that contribute to sustainability, operating from a number of sites across the world. When one of its UK sites required the addition of drying rooms, canteen spaces, and a meeting room, its team contacted our dedicated Modular Buildings division.

nterior of a modular building set up as a canteen with white tables, black chairs, fluorescent lighting, and a worker sitting at one of the tables

The results

Thanks to our positive ongoing relationship with Acciona, our expert team were able to establish exactly what was required within one quick phone call.

We supplied and installed several units as part of Acciona’s latest enquiry, including a three-storey, ten-unit joined open plan modular building to be used as the site’s canteen and drying room. Our team installed the units within a short timeframe, working with Acciona to ensure competitive pricing and also utilising UK stock on as many elements as possible to save on a 14-week lead time.

Thanks to our collaboration with Acciona from the initial enquiry, the process was seamless from start to finish.

Our Head of Conversions, Andy Nicholls, said: “We’re delighted with the result of the latest in a series of modular building solutions delivered throughout our year-long partnership with Acciona. Our team installed the units within a short timeframe, working with Acciona to ensure competitive pricing and also utilising UK stock on as many elements as possible, ultimately saving on a 14-week lead time. Our close collaboration with Acciona at all stages of this latest project ensured the process was seamless from start to finish.”

Exterior view of a single-story modular building on a construction site, with signage for site offices and welfare facilities

What our client said

Lee Price, Facilities Manager at Acciona Industrial UK commented: “S Jones expertly navigated the complexities of project planning and installation within a restricted and challenging site environment, ensuring minimal disruption to ongoing operations. Of particular note was the achievement in delivering a triple-stacked modular solution: a canteen topped by 2 drying rooms, all seamlessly integrated as a three-storey structure. The team meticulously coordinated logistics, leveraging UK stock for rapid deployment and carefully sequencing installation activities to maintain safety and site access. Their ability to adapt the modular design to the tight footprint and to manage crane lifts and onsite assembly with precision was instrumental in the success of the project. This innovative approach enabled S Jones to provide Acciona with the required facilities while maintaining the highest standards of efficiency and site harmony.”

If you’re interested in any of our services or have additional questions, please contact us. Our team is available to provide expert advice and support, ensuring you find the perfect solution for your needs.